{"id":161,"date":"2017-01-17T18:33:53","date_gmt":"2017-01-17T18:33:53","guid":{"rendered":"http:\/\/usbridge.com\/?p=161"},"modified":"2026-07-15T17:40:44","modified_gmt":"2026-07-15T21:40:44","slug":"short-span-steel-bridge-alliance-cannelville-road-bridge-case-study","status":"publish","type":"project","link":"https:\/\/usb.energyhill.dev\/es\/projects\/short-span-steel-bridge-alliance-cannelville-road-bridge-case-study\/","title":{"rendered":"Puente de EE. UU. Presentado en el Estudio de Caso del Puente de Cannelville Road"},"content":{"rendered":"<p>Once in awhile we are requested to perform along side of the best in our industry. The Cannelville Road Bridge was one of those stories. In Muskingum County we built a bridge that uses an innovative press-brake-formed steel tub girder (PBTG) system. We are proud of our technical prowess and innovation. We always build schedules that attempt to be met or superseded. However, the Cannelville project exceeds even our normal expectations. Ahead of schedule is always a good standard to set.\u00a0Short Span Steel Bridge Alliance Cannelville Road Bridge Case Study showcases our work and process.<\/p>\n<h1>Short Span Steel Bridge Alliance Cannelville Road Bridge Case Study<\/h1>\n<p>We are proud of this project and thankful for the team at\u00a0Short Span Steel Bridge Alliance for their case study on this project. The\u00a0Cannelville Road Bridge Case Study exemplifies what we aim to do on every project. The case study by Short Span Steel Bridge Alliance, in its full, <a href=\"http:\/\/www.shortspansteelbridges.org\/case-studies\/case-studies-folder\/copy-of-amish-sawmill-bridge---an-innovative-steel-solution.aspx?siteLocation=4c95aa33-45a1-4f62-a4fe-61d8d9a7be80\" target=\"_blank\" rel=\"noopener\">is found here<\/a>. Alternatively, <a href=\"http:\/\/www.shortspansteelbridges.org\/~\/media\/Files\/SSSBA\/Case%20Studies\/11-21-2017%20-%20Final%20Cannellville%20Road%20PBTG%20Bridge%20Case%20Study.pdf?la=en\" target=\"_blank\" rel=\"noopener\">click here to view it in PDF format<\/a>. Here is a summary of the case study findings of this bridge:<\/p>\n<ul>\n<li><span class=\"s1\">First of its kind in the state<\/span><\/li>\n<li><span class=\"s1\"><a href=\"https:\/\/usb.energyhill.dev\/es\/26-day-sps-bridge-installation\/\">Completed ahead of schedule in just 26 days<\/a><\/span><\/li>\n<li><span class=\"s1\">Service life of more than 100 years<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">Consists of modular shallow trapezoidal boxes fabricated from cold-bent structural steel plate<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">After the plate is formed, a thin lightweight deck is bolted to the girder, making it a modular unit for quick assembly on location<\/span><\/li>\n<\/ul>\n<p><a href=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-bridge-community.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-12454\" src=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-bridge-community.jpg\" alt=\"Cannelville case study bridge community\" width=\"1144\" height=\"597\" \/><\/a> <a href=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-bridge.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-12455\" src=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-bridge.jpg\" alt=\"Cannelville case study bridge base\" width=\"1141\" height=\"721\" \/><\/a> <a href=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-finished-bridge.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-12456\" src=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-finished-bridge.jpg\" alt=\"Cannelville case study finished bridge\" width=\"1280\" height=\"720\" \/><\/a> <a href=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-under-bridge.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-12457\" src=\"https:\/\/usb.energyhill.dev\/wp-content\/uploads\/2017\/12\/case-study-under-bridge.jpg\" alt=\"Cannelville case study under bridge\" width=\"1280\" height=\"720\" \/><\/a><\/p>\n<h2 class=\"p3\"><span class=\"s1\"><b>Cannelville Case Study Details<\/b><\/span><\/h2>\n<p class=\"p4\"><span class=\"s1\">This study showcases how we manufacture and deliver a bridge to the project location. We use trucks and deliver the prefabricated half-width modules ready to assemble. These 31 ton modules placed and setup in about 22 minutes. Think <a href=\"https:\/\/usb.energyhill.dev\/es\/our-bridge-building-process-is-as-simple-as-building-blocks\/\">legos<\/a>, but stronger. <a href=\"https:\/\/usb.energyhill.dev\/es\/our-bridge-building-process-is-as-simple-as-building-blocks\/\">View our infographic to learn more<\/a>. Read the full\u00a0<a href=\"http:\/\/www.shortspansteelbridges.org\/case-studies\/case-studies-folder\/copy-of-amish-sawmill-bridge---an-innovative-steel-solution.aspx?siteLocation=4c95aa33-45a1-4f62-a4fe-61d8d9a7be80\" target=\"_blank\" rel=\"noopener\">Short Span Steel Bridge Alliance Cannelville Road Bridge Case Study<\/a>.\u00a0<\/span><\/p>\n<h2 class=\"p3\"><span class=\"s1\"><b>Cannelville Road Bridge Project Highlights<\/b><\/span><\/h2>\n<ul>\n<li class=\"p4\"><span class=\"s1\">The fabrication process takes place offsite<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">Both PBTG\/SPS modules are set on the abutments in just 22 minutes<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">Each PBTG module with the SPS deck and TL-2 crash barriers weigh only 31 tons<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">The project completes ahead of schedule<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">The new bridge is set in place by an Ohio crew and has a service life of more than 100 years<\/span><\/li>\n<li class=\"p4\"><span class=\"s1\">This project opens the door for future PBTG projects in Muskingum County as well as additional counties and states<\/span><\/li>\n<\/ul>\n<h2><b>Cannelville Road Bridge Project Team<\/b><\/h2>\n<p>If you have more questions about the Cannelville Road Bridge Case Study please contact us.<\/p>\n<h3>County Engineer Muskingum County, Ohio<\/h3>\n<p><strong>Doug Davis, P.E., P.S.<\/strong><br \/>\n740.454.0155<br \/>\n<a href=\"mailto:mceo@rrohio.com\">mceo@rrohio.com<\/a><br \/>\n<a href=\"http:\/\/www.mceo.org\/\" target=\"_blank\" rel=\"noopener\">http:\/\/www.mceo.org\/<\/a><\/p>\n<h3>Bridge Contractor<\/h3>\n<p><strong>Puente de EE. UU.<\/strong><br \/>\nArt Rogovin<br \/>\n740-432-6334<br \/>\n<a href=\"mailto:info@usb.energyhill.dev\">info@usb.energyhill.dev<\/a><br \/>\n<a href=\"https:\/\/usb.energyhill.dev\/es\/\">https:\/\/usb.energyhill.dev\/<\/a><\/p>\n<h3>Bridge Fabricator and Press-Brake Forming<\/h3>\n<p><strong>Maico Industries Inc.<\/strong><br \/>\nDave Cox<br \/>\n785.472.5390<br \/>\n<a href=\"mailto:Dave.Cox@maicoind.com\">Dave.Cox@maicoind.com<\/a><br \/>\n<a href=\"http:\/\/www.maicoind.com\/\" target=\"_blank\" rel=\"noopener\">http:\/\/www.maicoind.com\/<\/a><\/p>\n<h3>Sandwich Plate System Deck<\/h3>\n<p><strong>SPS North America<\/strong><br \/>\nKay Jimison<br \/>\n503.545.6600<br \/>\n<a href=\"mailto:jimison@ie-sps.com\">jimison@ie-sps.com<\/a><br \/>\n<a href=\"http:\/\/www.ie-sps.com\/\" target=\"_blank\" rel=\"noopener\">http:\/\/www.ie-sps.com\/<\/a><\/p>\n<h3>Case Study Creation<\/h3>\n<p><strong>Short Span Steel Bridge Alliance<\/strong><br \/>\nRich Tavoletti<br \/>\nTel: 412.458.5822<br \/>\n<a href=\"mailto:rtavoletti@steel.org\">rtavoletti@steel.org<\/a><br \/>\n<a href=\"http:\/\/www.shortspansteelbridges.org\" target=\"_blank\" rel=\"noopener\">http:\/\/www.shortspansteelbridges.org<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Once in awhile we are requested to perform along side of the best in our industry. The Cannelville Road Bridge was one of those stories. In Muskingum County we built a bridge that uses an innovative press-brake-formed steel tub girder (PBTG) system. We are proud of our technical prowess and innovation. We always build schedules [&hellip;]<\/p>\n","protected":false},"featured_media":162,"template":"","categories":[5,490,494],"tags":[14,20,47,48,46,45],"bridge-models":[497],"class_list":["post-161","project","type-project","status-publish","has-post-thumbnail","hentry","category-case-study","category-featured-projects","category-national-projects","tag-construction","tag-design","tag-pbtg","tag-road-bridge","tag-short-span","tag-sps","bridge_model-folded-steel-plate-girder"],"acf":[],"_links":{"self":[{"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/projects\/161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/projects\/161\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/media\/162"}],"wp:attachment":[{"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/media?parent=161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/categories?post=161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/tags?post=161"},{"taxonomy":"bridge_model","embeddable":true,"href":"https:\/\/usb.energyhill.dev\/es\/wp-json\/wp\/v2\/bridge-models?post=161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}