Once in awhile we are requested to perform along side of the best in our industry. The Cannelville Road Bridge was one of those stories. In Muskingum County we built a bridge that uses an innovative press-brake-formed steel tub girder (PBTG) system. We are proud of our technical prowess and innovation. We always build schedules that attempt to be met or superseded. However, the Cannelville project exceeds even our normal expectations. Ahead of schedule is always a good standard to set. Short Span Steel Bridge Alliance Cannelville Road Bridge Case Study showcases our work and process.
We are proud of this project and thankful for the team at Short Span Steel Bridge Alliance for their case study on this project. The Cannelville Road Bridge Case Study exemplifies what we aim to do on every project. The case study by Short Span Steel Bridge Alliance, in its full, is found here. Alternatively, click here to view it in PDF format. Here is a summary of the case study findings of this bridge:
This study showcases how we manufacture and deliver a bridge to the project location. We use trucks and deliver the prefabricated half-width modules ready to assemble. These 31 ton modules placed and setup in about 22 minutes. Think legos, but stronger. View our infographic to learn more. Read the full Short Span Steel Bridge Alliance Cannelville Road Bridge Case Study.
If you have more questions about the Cannelville Road Bridge Case Study please contact us.
Doug Davis, P.E., P.S.
740.454.0155
mceo@rrohio.com
http://www.mceo.org/
U.S. Bridge
Art Rogovin
740-432-6334
info@usb.energyhill.dev
https://usb.energyhill.dev/
Maico Industries Inc.
Dave Cox
785.472.5390
Dave.Cox@maicoind.com
http://www.maicoind.com/
SPS North America
Kay Jimison
503.545.6600
jimison@ie-sps.com
http://www.ie-sps.com/
Short Span Steel Bridge Alliance
Rich Tavoletti
Tel: 412.458.5822
rtavoletti@steel.org
http://www.shortspansteelbridges.org
Select a region or search by state to find your U.S. Bridge contact.